Mostrar registro simples

dc.contributorEscuela de Ingenierias Industrial, Informática y Aeroespaciales_ES
dc.contributor.advisorBúrdalo Salcedo, Gabriel 
dc.contributor.authorRey González, Sergio
dc.contributor.otherMaquinas y Motores Termicoses_ES
dc.date2023-07
dc.date.accessioned2024-06-05T06:54:39Z
dc.date.available2024-06-05T06:54:39Z
dc.date.submitted2023-07
dc.identifier.citationRey González, S. (2023). Diseño y optimización de una planta industrial de procesamiento de cefalópodos y almacenamiento frigorífico. [Trabajo de fin de Grado, Universidad de León]es_ES
dc.identifier.urihttps://hdl.handle.net/10612/21182
dc.description.abstract[ES] processing and distribution. The industrial processing capacity is 26,528 t of cephalopods per year. The structure of the industrial building is metallic and has a four-sided layout, being formed by two adjoining porticoes due to its large dimensions. The total area occupied by the building is approximately 6,000 m2. In addition, a set of complementary installations has also been designed. The duration of the execution and commissioning of the civil works and installations of this project will be 284 working days. During the calculation, design and execution of this project, the current applicable regulations and all the parameters and procedures included in them have been taken into account. Finally, the total budget amounts to €5,613,506.86.es_ES
dc.description.abstract[EN] The industrial plant which is the object of this project is located in the Port of Vilagarcía de Arousa, in the province of Pontevedra; more specifically, in the Muelle de Comboa, which is located in Subsector S.1.5. of the aforementioned port. The industrial activity to be developed in this ship is based fundamentally on the reception of various types of cephalopods in a frozen state, for their subsequent bprocessing and distribution. The industrial processing capacity is 26,528 t of cephalopods per year. The structure of the industrial building is metallic and has a four-sided layout, being formed by two adjoining porticoes due to its large dimensions. The total area occupied by the building is approximately 6,000 m2. In addition, a set of complementary installations has also been designed. The duration of the execution and commissioning of the civil works and installations of this project will be 284 working days. During the calculation, design and execution of this project, the current applicable regulations and all the parameters and procedures included in them have been taken into account. Finally, the total budget amounts to €5,613,506.86.es_ES
dc.languagespaes_ES
dc.relationGrado en Ingeniería Mecánicaes_ES
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 Internacional*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/*
dc.subjectIngeniería de sistemases_ES
dc.subjectIngeniería industriales_ES
dc.subject.otherCefalópodoes_ES
dc.subject.otherProcesamientoes_ES
dc.subject.otherAlmacenamiento frigoríficoes_ES
dc.subject.otherInstalación frigoríficaes_ES
dc.subject.otherPlanta industriales_ES
dc.titleDiseño y optimización de una planta industrial de procesamiento de cefalópodos y almacenamiento frigoríficoes_ES
dc.title.alternativeDesign and optimitation of an industrial cephalopod processing and cold storage plantes_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses_ES
dc.subject.unesco3313.26 Equipo de Refrigeraciónes_ES
dc.subject.unesco3310.03 Procesos Industrialeses_ES


Arquivos deste item

Thumbnail

Este item aparece na(s) seguinte(s) coleção(s)

Mostrar registro simples

Attribution-NonCommercial-NoDerivatives 4.0 Internacional
Exceto quando indicado o contrário, a licença deste item é descrito como Attribution-NonCommercial-NoDerivatives 4.0 Internacional